Mar-2020
Service:
Instruments & Control
Client:
PT PLN Nusantara Power
There are 2 PLTGU blocks at PT Indonesia Power Semarang Power Generation Unit where both blocks use DCS from different brands. Block 1 uses DCS OC600E GE while block 2 uses DCS Infi-90 ABB. Both DCS have information about unit operation in realtime. For the purposes of centralized planning and monitoring strategies, an OPC server intergration system was created that can connect information from the two DCS to the data center so that it can be monitored online and in realtime. Related Projects
|